1. Home
  2. /
  3. Panel Help
  4. /
  5. Project Management
  6. /
  7. Copy structure selection (POM060B)

Copy structure selection (POM060B)

Related topics

The purpose of this program is to copy the project line material and operation structure from Basic data or from a Project or a Project quotation phase line. The complete structure is copied: materials, operations and operation texts.

Item
The item code if the structure is copied from Basic data.
Warehouse
The warehouse structure to be copied, if the structure is copied from Basic data. Note: This field is only displayed when the Warehouse in BOM function is activated.
Variant
The item variant if the structure is copied from Basic data. Note: This field is only displayed when the Warehouse in BOM function is activated.
Proj quot
The quotation and version number if the structure is copied from a quotation. If the version number field is left blank the default is the last version.
Project
The project number if the structure is copied from a project.
Phase
Line
Stop at end network
Indicates if all levels of the structure should be copied. If this field is set to YES, the copying will be stopped where the End network in the material structure is set to YES.
Copy prices
Indicates if the structure should be copied with or without prices. If this field is set to YES, the prices are copied from basic data, the project or the project quotation phase line structure. If set to NO, all price fields will be zero. They have to be entered by the user.