The purpose of this program is to copy the project line material and operation structure from Basic data or from a Project or a Project quotation phase line. The complete structure is copied: materials, operations and operation texts.
- Item
- The item code if the structure is copied from Basic data.
- Warehouse
- The warehouse structure to be copied, if the structure is copied from Basic data. Note: This field is only displayed when the Warehouse in BOM function is activated.
- Variant
- The item variant if the structure is copied from Basic data. Note: This field is only displayed when the Warehouse in BOM function is activated.
- Proj quot
- The quotation and version number if the structure is copied from a quotation. If the version number field is left blank the default is the last version.
- Project
- The project number if the structure is copied from a project.
- Phase
- Line
- Stop at end network
- Indicates if all levels of the structure should be copied. If this field is set to YES, the copying will be stopped where the End network in the material structure is set to YES.
- Copy prices
- Indicates if the structure should be copied with or without prices. If this field is set to YES, the prices are copied from basic data, the project or the project quotation phase line structure. If set to NO, all price fields will be zero. They have to be entered by the user.