1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Work centre simulation price...

Work centre simulation price maintenance (BAS009B)

The purpose of this program is to maintain hourly prices and overhead percentages in the Work centres simulation file. This information is used for product costing simulations. This means that if a calculated bill of routing contains an operation whose work centre is stored in the simulation file, the registered hourly prices and overhead percentages are used.

Work centre
Machine price
The machine price for the simulation. If the field is left blank the calculation for the machine price will end up with zero.
Run and labour price
The run and labour price for the simulation. If the field is left blank the calculation for run and labour price will end up with zero.
Set-up internal price
The internal set-up price for the simulation. If the field is left blank the calculation for set-up price will end up with zero.
Set-up external price
The external set-up price for the simulation. If the field is left blank the calculation for set-up price will end up with zero.
Overhead 1 %
The overhead percent for production overhead simulation. If the field is left blank the calculation for production overhead will end up with zero.
Overhead 2 %
The overhead percent 2 for production overhead simulation. If the field is left blank the calculation for production overhead will end up with zero.
Overhead 1 amount
The overhead amount for production overhead simulation. If the field is left blank the calculation for production overhead will end up with zero.
Overhead 2 amount
The overhead amount 2 for production overhead simulation. If the field is left blank the calculation for production overhead will end up with zero.