1. Home
  2. /
  3. Panel Help
  4. /
  5. Project Management
  6. /
  7. Structure maintenance (POM060A)

Structure maintenance (POM060A)

Related topics

The purpose of this program is to start project/quotation material and bill of routing maintenance. This program allows the user to enter a special project/quotation product structure. The product structure can be copied from Basic data. All items used in this function must exist in Basic data. Each price element (item price, overhead, labour price, setup prices etc.) can only be changed for the entered structure.

Function keys

Print structure Print the project/quotation structure.
Product costing Start the product costing of the project/quotation structure.
Accept structure Accept the bill of material and bill of routing. No further maintenance on the project/quotation structure will be allowed.
Cancel acceptance Cancel the acceptance of the bill of material and bill of routing. Structure maintenance will be possible again.
Product costing enquiry View the product costing of the project/quotation structure.
Customer
Project no
Status
The code indicates the status of the project/quotation.

Valid codes are:

Phase
Line number
Item
The code from the element line indicates the item.
Quantity
The quantity of the line.
Selection
The code indicates the function to be started.

Valid codes are:

Code Description
1 Material structure maintenance
2 Operations maintenance
3 Copy structure selection