Supply plan lower level creation (REQ036C)

Related topics

From this panel you can create a supply plan for lower level materials. The calculation is based on produced items in an existing supply plan. See Supply plan process for information about the different process steps.

Calculate to level
The number indicates the maximum number of levels to be handled.
Lead time adjustment
Indicates if requirements on lower levels should take the lead time into consideration when allocating the requirement date.