1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. BOM/BOR Update from M-order...

BOM/BOR Update from M-order stat, Selections (PRO035B)

On this panel you select what is to be included in the new BOM/BOR update proposal.

Proposal description
Mandatory entry. The description of the proposal.

Selection

  • Period
  • Item group
  • Item family
  • Item sector
  • Department section
  • Warehouse
    This field is only displayed if Variant handling is set to YES in the MFG control file.
  • Variant
  • Item type
    Only item type 1 and 2 are valid.
  • Manufacturing order
  • Item
Include already used
Indicates if already used manufacturing order statistics should be included in the average time/quantity calculation.
Update option
The code indicates what is to be calculated and updated in the BOM/BOR in Basic data.

Valid codes are:

Code Description
1 The operations (BOR) in Basic data will be updated.
2 The material (BOM) in Basic data will be updated.
3 Both operations and material in Basic data will be updated.