Quantity on hand level calculation (INV009A)

Using this program you can calculate the quantity on hand levels for items with planning method type 5 (Shortage analysis min/med/max). The calculation is done from the MRP order proposal record for the set-up of reading different horizons for the three different quantity on hand levels.

Warehouse
Item
Item group
Lead time factor
The lead time factor is used to multiply the lead time to get number of days for forecast horizon.
Rounding off
The code indicates how the calculated quantity should be rounded off.

Valid codes are:

Code Description
1 No decimals
2 One decimal
3 Two decimals
4 No rounding off
Simulation version
The simulation version. Note: Leave this field blank if the operative version should be used.