Using this program you can calculate the quantity on hand levels for items with planning method type 5 (Shortage analysis min/med/max). The calculation is done from the MRP order proposal record for the set-up of reading different horizons for the three different quantity on hand levels.
- Warehouse
- Item
- Item group
- Lead time factor
- The lead time factor is used to multiply the lead time to get number of days for forecast horizon.
- Rounding off
- The code indicates how the calculated quantity should be rounded off.
Code Description 1 No decimals 2 One decimal 3 Two decimals 4 No rounding off
- Simulation version
- The simulation version. Note: Leave this field blank if the operative version should be used.