The purpose of this program is to enquire about values that are related to the product costing calculation concerning operations times and costs.
Function keys
Minutes/Decimals | Toggle between hours and minutes and hours and decimals for the operation times. |
- Item
- Cost period
- The period on the product costing. If the period is 000000, this means that it is the current product costing.
- Warehouse
- Variant
- Cost type
- The description indicates if the product costing is current, future or a simulation costing type.
- Struct quant
- Price type
- The prices used for the product costing.
- Std quant PC
- The quantity used when the product costing was performed.
- Struct unit
- Operation number
- Work centre
- Op description
- Time basis code
- Set-up time int
- Set-up time ext
- Run and labour time
- Machine time
- The machine time in hours for the operation. This time is used as a part in product costing calculation function in combination with the work centre hours costs.
- Subc price
- This field is only displayed if the IBS Manufacturing sub-contractor functionality is activated in Work with companies. This is the sub-contract price. This value can be used in the cost model.
- Subc set-up price
- This field is only displayed if the IBS Manufacturing sub-contractor functionality is activated in Work with companies. This is the sub-contract set-up cost. This value can be used in the cost model.
- Line amount
- The total cost for the actual operation.