1. Home
  2. /
  3. Panel Help
  4. /
  5. Manufacturing
  6. /
  7. Structure maintenance, Bill of...

Structure maintenance, Bill of routing (BAS003Y)

On this panel you can maintain the sub-contractor and quality control information for the selected operation. Note: If the Subc operation field is set to NO on the previous maintenance panel, the sub-contractor related fields will not be displayed on this panel.

Item
Warehouse
Structure unit
Indicates the structure unit for the item. See Structure unit handling for more information.
Variant
Structure quantity
Operation number
Description
Work centre
Supplier
The supplier that is used in the sub-contract handling.
Subc price
The sub-contract price. If the price is stated it will be used for costing in product costing, manufacturing order costing. It is also used when the purchase order is created from the manufacturing order sub-contract maintenance function.
Subc set-up price
If set-up price is stated and the operation is coded as a sub-contract operation, the set-up price will be used in the product costing in Manufacturing order costing. It is also used when the purchase order is created from the manufacturing order sub-contract maintenance function.
VAT based
Indicates if this is a VAT based item. This code is defaulted to the purchase order line, where it can be changed.
VAT included
Indicates if VAT is included in the purchase price of the item. This code is defaulted to the purchase order line, where it can be changed.
Include VAT % code
This field is only displayed for purchase orders. The VAT handling code for the VAT percentage, if any, which is included in the purchase price.

If VAT included is set to NO, this field must be left blank. If VAT included is set to YES, enter a valid code from the VAT handling code table.