The lead time proposal is used for the calculation of lead times for a selection of items. The result of the calculation is a work file in which the lead times can be maintained before being updated in the Item warehouse file and Item file.
For information about how the lead times are calculated, see Production lead time and Lead time.
- Select the Work with lead times menu item.
- You access Work with item lead times. Click Add to add a new lead time proposal.
- You access Lead time proposal creation. Complete the following fields:
- Description
- Enter a description of the lead time proposal.
- Include items
- Indicate what items are to be included in the proposal by ticking one of the following: All, or New lead time calculated.
- Lead time calc
- Indicate how the lead time should be calculated by ticking one of the following: Only prod lead time, Calc one level with crit comp or Calc total all levels.
Click OK to update the new proposal. Exit the routine.